Get a Free Quote

Our representative will contact you soon.
Email
Name
Company Name
Rated Capacity
Rated Voltage
Country
Message
0/1000

Get a Free Quote

Our representative will contact you soon.
Email
Name
Company Name
Rated Capacity
Rated Voltage
Country
Message
0/1000
Manufacturing & quality control

Manufacturing Strength Behind Every Transformer

From engineering and material preparation to precision manufacturing, final assembly and factory testing, YAWEI integrates equipment, process control and quality management to deliver transformers for utility, industrial and international EPC projects.

Since 1993Continuous development in transformer manufacturing and international engineering.
200,000 m²YAWEI manufacturing base expanded to this area in 2024.
500 kV WorkshopA dedicated high-voltage production facility added in 2021.
ERP Since 2012Digital management supports production planning and operational coordination.
Manufacturing Strength

Scale, equipment and experience for diverse transformer projects

YAWEI combines a large manufacturing base, dedicated high-voltage facilities, specialized production equipment and international project experience.

200,000 m²

Manufacturing Base

The factory area expanded to 200,000 square meters in 2024, supporting transformer production, assembly and testing activities.

LARGE-SCALE FACILITY
500 kV

Dedicated Workshop

A dedicated 500 kV workshop was added in 2021 to strengthen YAWEI’s high-voltage manufacturing infrastructure.

HIGH-VOLTAGE CAPABILITY
3–400 kV

Power Transformer Range

YAWEI’s power transformer portfolio covers voltage applications from 3 kV to 400 kV and rated capacity up to 240 MVA.

UP TO 240 MVA
6+ Systems

Specialized Equipment

Core cutting and slitting, automatic stacking, vertical and horizontal winding, epoxy vacuum casting and robotic welding support key manufacturing stages.

INTEGRATED PRODUCTION
ERP

Digital Production Management

ERP management has supported production planning, information coordination and operational management since 2012.

DIGITAL COORDINATION
6 Regions

International Project Experience

YAWEI equipment has been supplied across South America, North America, Asia, Australia, Europe and Africa.

GLOBAL DELIVERY
Production Process

Eight coordinated stages from materials to shipment release

Each stage combines defined process controls, quality records and a clear contribution to transformer performance and delivery reliability.

01MATERIAL CONTROL

Incoming Materials

Confirm conductor, silicon steel, insulation, oil, bushings and purchased components against the approved specification.

  • Material identity and batch
  • Certificate and dimensional checks
  • Accepted / rejected status
02PRECISION PROCESS

Core Cutting & Stacking

Silicon-steel cross-cutting, slitting and automatic stacking equipment supports accurate, consistent core manufacture.

  • Cutting and slitting accuracy
  • Step-lap / joint control
  • Core dimensions and clamping
03PRECISION PROCESS

Winding

Vertical and horizontal winding machines support different winding structures, capacities and production requirements.

  • Turns and conductor identity
  • Tension and geometry
  • Inter-turn insulation
04INSULATION CONTROL

Insulation, Drying or Casting

Epoxy vacuum casting supports dry-type insulation manufacture, while oil-immersed units follow controlled insulation, drying and oil-processing procedures.

  • Insulation material control
  • Drying / casting cycle
  • Moisture and cleanliness
05PRECISION PROCESS

Tank & Structural Fabrication

Robotic welding and controlled fabrication processes support tank consistency, sealing performance and structural quality.

  • Welding and dimensional control
  • Leak / sealing checks
  • Surface preparation and coating
06MATERIAL CONTROL

Final Assembly

Core, windings, tank, bushings, tap equipment, cooling and monitoring devices are integrated to the approved design.

  • Connections and torque
  • Clearances and accessories
  • Nameplate and drawing match
07QUALITY ASSURANCE

Factory Testing & FAT

Routine, type and special testing supports product quality assurance, with applicable tests and FAT arrangements aligned to the adopted standard and project specification.

  • Per-unit routine testing
  • Calibration traceability
  • FAT witness and report review
08DELIVERY CONTROL

Packing & Shipment Release

Packing, moisture protection, impact monitoring and release documents should match the logistics plan.

  • Packing and protection
  • Document completeness
  • Shipment-release approval
Quality & Testing Assurance

Management systems, measurement capability and independent testing resources

YAWEI supports manufacturing quality through management systems, metrology, factory testing and third-party testing resources.

ISO 9001

Quality Management

A quality-management framework supports control from product development and design through manufacturing and testing.

PROCESS QUALITY
ISO 14001

Environmental Management

Environmental management is integrated with YAWEI’s commitment to the green development of electrical equipment.

ENVIRONMENTAL SYSTEM
ISO 45001

Occupational Health & Safety

Occupational health and safety management supports responsible workshop operations and employee protection.

WORKPLACE SAFETY
CNAS

Measurement & Calibration

CNAS-related certificate materials and enterprise metrology qualification support measurement traceability and test quality.

METROLOGY SUPPORT
3 Test Bodies

Independent Testing Resources

Products have been tested through the National Transformer Quality Supervision and Inspection Center, CEPRI Wuhan and Suzhou Electrical Apparatus Research Institute.

THIRD-PARTY TESTING
3 Test Levels

Product Quality Verification

Routine, type and special tests support manufacturing release, design validation and project-specific quality assurance.

ROUTINE · TYPE · SPECIAL

International standard capability

YAWEI manufactures transformers for projects referencing IEC, IEEE, ANSI, CSA and EN requirements, aligning design and testing with the adopted project standard.

Product certification resources

Certificate materials include UL, CE, TUV, KEMA, GOST and related product qualifications for applicable transformer categories and markets.

Quality Control Across Every Stage

Process controls create consistent manufacturing results

YAWEI links each major production stage with defined quality controls, production records and a clear customer benefit.

Manufacturing stage Key quality control Quality record Customer value
Incoming materials Identity, grade, quantity, batch and acceptance status Material certificates and incoming-inspection records Consistent material quality and traceability
Core manufacturing Cutting, burr, stacking, dimensions and clamping Core process and in-process inspection records Controlled no-load performance and mechanical consistency
Winding Turns, tension, insulation and dimensions Winding and dimensional inspection records Stable ratio, impedance and mechanical performance
Tank fabrication Welding, dimensions, sealing and coating Welding, dimensional, leak-test and coating records Reduced leakage, corrosion and structural risk
Final assembly Connections, torque, clearances and accessories Assembly inspection and hold-point records Conformance with approved drawings and accessories
Factory testing Standard test items and calibrated measurement Routine-test reports, calibration and FAT records Objective quality evidence before shipment
Quality from process to performanceMaterial traceability, controlled manufacturing, calibrated testing and complete quality records work together to support reliable transformer performance and smooth project acceptance.
Manufacturing for project requirements

Discuss your transformer project with YAWEI

Share the target voltage, capacity, application, standard and delivery requirements so our team can align the manufacturing and quality plan with your project.